Detail of water pipe of small Hydro-Power Plant in Jasenie in Nizke Tatry national park during summer, Low Tatras mountains, Europe, Slovakia. The plant was put into operation in 1924. It is owned by the nearby ironworks factory Zeleziarne Podbrezova. Pipelines collect water from the three nearby valleys into a reservoir with a capacity of 9,000 m2 of water. The length of each of the pipes is more than 7 km. From the reservoir, an 850m-long pipeline feeds the water to the plant. The inflow of water, with a drop of 196 metres and a flow rate of 1.5 m3 sec., yields a power output of 2.3 MW, generated by two PELTON-type turbines (20 atm.). The smaller, single-blade turbine captures 0.5 m3 sec., while the bigger, two-blade turbine handles the rest of the water flow.
圖片編號:
304655847
拍攝者:
Kordoz
點數下載
授權類型 | 尺寸 | 像素 | 格式 | 點數 | |
---|---|---|---|---|---|
標準授權 | XS | 320 x 480 | JPG | 13 | |
標準授權 | S | 533 x 800 | JPG | 15 | |
標準授權 | M | 1414 x 2121 | JPG | 18 | |
標準授權 | L | 1825 x 2738 | JPG | 20 | |
標準授權 | XL | 2309 x 3464 | JPG | 22 | |
標準授權 | MAX | 4000 x 6000 | JPG | 23 | |
標準授權 | TIFF | 5657 x 8485 | TIF | 39 | |
進階授權 | WEL | 4000 x 6000 | JPG | 88 | |
進階授權 | PEL | 4000 x 6000 | JPG | 88 | |
進階授權 | UEL | 4000 x 6000 | JPG | 88 |
XS
S
M
L
XL
MAX
TIFF
WEL
PEL
UEL
標準授權 | 320 x 480 px | JPG | 13 點 |
標準授權 | 533 x 800 px | JPG | 15 點 |
標準授權 | 1414 x 2121 px | JPG | 18 點 |
標準授權 | 1825 x 2738 px | JPG | 20 點 |
標準授權 | 2309 x 3464 px | JPG | 22 點 |
標準授權 | 4000 x 6000 px | JPG | 23 點 |
標準授權 | 5657 x 8485 px | TIF | 39 點 |
進階授權 | 4000 x 6000 px | JPG | 88 點 |
進階授權 | 4000 x 6000 px | JPG | 88 點 |
進階授權 | 4000 x 6000 px | JPG | 88 點 |