圖片

照片


插圖


向量


影片

影片


特效


音樂

音樂


音效


版型

簡報


網頁


3D

VR

年/月下載

Premium+

創意無限載

關於創意王

品牌淵源


服務內容


授權說明

影像授權


月下載、年下載


音效、影片、特效


授權對象 / 最終使用者


授權類型


常見問題

付款相關


問題回報


聯絡我們

電話 : +886 2 8978 1616


傳真 : +886 2 2708 5115


info@imagedj.com


106 台北市大安區信義路四段 380 號 8 樓之 1


週一至週五,9:30-12:30/13:30-18:00


點數下載

The Bangkok Elevated Road and Train System (BERTS, Thai: โครงการระบบการขนส่งทางรถไฟยกระดับในกรุงเทพมหานคร), commonly known as the Hopewell Project (โครงการโฮปเวลล์) after main contractor Hopewell Holdings, was a failed project to build an elevated highway and rail line from central Bangkok to Don Mueang International Airport. Construction started in 1990, but was suspended by the 1st government of Anand Panyarachun in 1992, and was finally halted by legal acrimony in 1997 with only 10-13% complete. The project was cancelled in 1998. The project left over one thousand concrete pillars standing idle along the planned routes, described by the Bangkok Post as a Bangkok version of Stonehenge. Revivals of the project were proposed periodically by both Hopewell and SRT, but were always shot down by the government of then Prime Minister Thaksin Shinawatra. According to an Asian Institute of Technology study, the vast majority of the pillars remain structurally sound and in usable condition, and it has been proposed to use them to build an extension of the BTS Skytrain. Much of the Uttaraphimuk Elevated Tollway on Vibhavadi Rangsit Road parallels the BERTS north-south alignment, with some flyovers since built that obstruct parts of the route. All of the BERTS east-west line's pillars were demolished from 2005 to 2007 during the construction of the Suvarnabhumi Airport Link, which opened to the public in August 2010. The planned SRT Red Lines would cover the rest of the BERTS north-south line, and the project has been described as a Hopewell revival. A section of the Hopewell structure collapsed onto the main northern line on 1 March 2012. A massive concrete slab 50m by 20m collapsed near Wat Samian Nari temple in Chatuchak district. No injuries were reported. The northern SRT Dark Red commuter Line which will run from Bang Sue to Rangsit started construction in May 2013. The 'Hopewell revival' as some term it, will be an elevated line. Shared tracks or separated tracks for High Speed Rail, DMU/Diesel Tracks, Airport Line extension and Dark Red Line Commuter will eventually be constructed. Though some of the BERTS structures may be used for the Dark Red Line most will be demolished. Demolition of the pillars on the north-south line started in 2013.

圖片編號: 37662005
拍攝者: Tuayai

點數下載

其他用途或大量購買方案,
請洽 02-89781616 或
EMAIL : info@imagedj.com由專人為您服務
授權類型 尺寸 像素 格式 點數
標準授權 XS 480 x 318 JPG 13
標準授權 S 800 x 530 JPG 15
標準授權 M 2128 x 1409 JPG 18
標準授權 L 2747 x 1819 JPG 20
標準授權 XL 3475 x 2301 JPG 22
標準授權 MAX 4928 x 3264 JPG 23
標準授權 TIFF 6969 x 4616 TIF 39
進階授權 WEL 4928 x 3264 JPG 88
進階授權 PEL 4928 x 3264 JPG 88
進階授權 UEL 4928 x 3264 JPG 88

XS

S

M

L

XL

MAX

TIFF

WEL

PEL

UEL

標準授權 480 x 318 px JPG 13 點
標準授權 800 x 530 px JPG 15 點
標準授權 2128 x 1409 px JPG 18 點
標準授權 2747 x 1819 px JPG 20 點
標準授權 3475 x 2301 px JPG 22 點
標準授權 4928 x 3264 px JPG 23 點
標準授權 6969 x 4616 px TIF 39 點
進階授權 4928 x 3264 px JPG 88 點
進階授權 4928 x 3264 px JPG 88 點
進階授權 4928 x 3264 px JPG 88 點

DOWNLOAD

相似主題

英文關鍵字